Backup schedule

From MTG Wiki
Jump to: navigation, search

Servers are backed up daily using CCC as follows:

Chronologically:

  • 6 p.m.: Dev Macintosh HD
  • 9 p.m.: Dev DataHD
  • 11 p.m.: INDD Macintosh HD
  • 12.30 a.m.: Prod DataHD
  • 2.30 a.m.: INDD DataHD
  • 4 a.m.: Prod Macintosh HD

Prod

  • Macintosh HD: 4 a.m.
  • DataHD: 12.30 a.m.

Dev

  • Macintosh HD: 6 p.m.
  • DataHD: 9 p.m.

INDD

  • Macintosh HD: 11 p.m.
  • DataHD: 2.30 a.m.